eˮM(jn)O(sh)ֹy̖߀O(sh)еy(j)Ñʹrbybbyr(yng)ж
Screw plugs are placed at the top and the bottom of
the pump bodv respectively for pouring or discharging WaterTo avoid the return flow of
the water m the pump when the pump stopsa non-return
valve is installed at the irdetA bottom valve is also
installed in pumps of certain modelIt can be installed
or not according to the customers usesWhen it is
installedthe screw plug should be unscrewed
|
|
Material |
||
Q Name of parts |
ˮ Sea water |
݆ˮ Fresh water for seagoing ship |
(ni)݆ˮ Fresh water for inland fiver ship |
wúwPump Body,rear prop cover |
ZcuZn16Si4 |
QT450-10 |
HT200 |
~݆ܷh(hun)Vane wheel,Sealing ring |
ZcuZn16Si4 |
HT200 |
|
м(lin)SBracket, Shaft coupling |
QT450-10 |
HT200 |
|
ωwGland |
ZcuZn16Si4 |
QT450-10 |
HT200 |
SShaft
sleeve |
QA19-4 |
45 |
|
SShaft |
1Cr18Ni9Ti |
||
Base |
Q235-AӼ(weld assembly) |
41\(yn)D(zhun)ǰĜ(zhn)Preparation
for operation
41.1ӱǰȱPӱS_D(zhun)ӟoסĥF(xin)
Before starting the pumpturn
the pumpshaft by handMake
sure thatit Can revolve smoothly
41.2ȫ_M(jn)yTurn
on the inlet valve fully
41.3_yڏϜy_y _ԱrŚ
Tum on the outlet valve or the pressure measuring
hole at the outlet bend or turn on the outlet valve 1/10 so as to discharge air
when the pump is self-sucking
41.4һӕr(yng)Q_w픲w(ni)Mˮ(yn)δˮ
|